Location: NodeLuckyLab
Date and Time: Wednesday, January 30, 2019, 6:30-8:00 p.m.
Scribe: You
Roll Call: RussellSenior,JasonBergstrom,TomasKuchta,MatthewKlug,SteveTree,ChrisBushick
Agenda
- Stephouse/Wiline transition uncertainties
- Node notes:
NodeArborLodge -- losing a roof on N. Atlantic after a seven year run, maybe due for re-engineering.
NodeAnkenyTap -- still need to bill for autumn work
NodeTwentyThirdTap -- still need to bill for hardware
NodeBrelin -- still need to bill for hardware
NodeGriswold -- having some printer trouble, also has lead on another APU node
- Cacti -- uptime graphs suddenly started working again after a recent update
- knod issue:
- host-ipaddr.service: socat processes remain running, currently about 24 extra
- drei issue:
- letsencrypt key rotation for inspircd (permissions problem)
- nginx: bad gateway due, i think, to left over cruft from cwnmyr, needs cleanup at least enough for letsencrypt to work
<add-your-agenda-item-here>
Notes
Orange hosting - Stephouse and Freewire have been hoovered up by WiLine
- OSUOL - a ways to drive
- Spiretech - concern about power $
- PSU - known $
- Russell's basement $ for IPs
- Michael Rasmussen is secondary for DNS
- bandwidth is about 1 Mb
- Node notes
NodeArborLodge - SkyPilot Extender on Atlantic, Miriam Linder - re-roofing
- Will be taken down, is there another host?
- Node installs/HW Russell needs to bill for
NodeGriswold printer issue, also ADU host possibility in same neighborhood
NodeLuckyLab - AP issue, Russell will try replacing MR24 and power supply at the next monthly - no interface error stats though
Russell has been upgrading WNDR3800 firmware: Buzz,AnkenyTap,RussellsMum
- issue with vlan tagging removal on older hardware - is there a lingering issue?
- Russell ordered replacement flash for buffalos
- Next week's meeting - NodeLuckyLabNW - Jason at HNA meeting instead