'''Location:''' Jojo's 902 NW 13th<
>
'''Date and Time:''' Wednesday, January 3, 2024, 6:30pm-8:00pm<
>
'''Scribe:''' You<
>
'''Roll Call:''' TedBrunner,JasonBergstrom,MatthewKlug,RussellSenior,JonArmani,SteveTree<
>
'''Agenda'''
* Pick location for next weekly
* Node notes:
* NodeAnnapurna -- A bunch of APs are plugged in, bridged with dumb switches. Ole is considering more APs to the additional stairwells, possibly another 5 MR24s. Some work done on Zyxel GS1900-24e switch firmware.
* NodeBeulahLand -- is offline since early December, needs a visit
* NodeWhet -- ISP transition report?
* NodeLionsEye -- is offline since mid-December, needs a visit
* NodeEcotrust -- needs a PoE injector for downstairs AP.
* NodeAlhambra -- more adjustments, also moving towards a firmware refresh and vlan rationalization after initial experimental expansions
* NodeBuffaloGap -- ap3 seems to be unreachable, will ping node host to see about a power cycle
* NodeWhet -- upgraded from legacy DSL service to Quantum fiber (500Mbps symmetric) Very smooth process and install!
* NodeBrunner -- request from tenant for better wifi for online classes. Move existing MR.24 AP closer to apt. which requires PoE. Router is APU2 with no free ethernet ports.
* Gear disposal:
* 7 lengths of LMR400 gifted to a contributor, they had been in the stockpile unused for most of Russell's involvement with PTP, since the mid-aughts, unlikely to ever use them, given modern PoE-powered radios.
* other random detritus, e.g. ancient 802.11b Cisco APs, in pile to go to e-waste.
* APRA Grant update -- no news, presumably due to holidays. still waiting on security-instrument specifications, MOU finalization.
* Russell going to Seattle on Thursday, back by Friday evening if not earlier.
* ''Your Item Here''
'''Notes'''
* Node notes:
* NodeAnnapurna - Russell flashed 24 port (smart) switch, 7 APs deployed in 5 buildings, 1 facing into pool area, 1 in garage area. Issue on buildings with 3 stairwells can't reach AP from ends.
* Would like 5 more APs
* Has a drone, interested in placing AP in large cedar
* Has given us check for 10 APs and Gateway
* NodeBeulahLand - failing RJ45 connector tab - Russell will try to replace
* NodeLionsEye - off since mid December
* NodeEcotrust - Russell has a replacement injector - Jason will try to replace
* NodeAlhambra - Needs vlan rationalization and firmware refresh
* NodeBuffaloGap - AP3 unreachable
* NodeWhet - transition off DSL to "Quantum" (cheaper and 500Mb symmetric)
* NodeBrunner - Move AP to better improve access (but has to be outside of apartment)
* Gear disposal - LMR400 multiple 10's of foot sections disposed of + CiscoAP (802.11b) shed, saved shelf space
* ARPA Grant
* DIN - mid-November meeting cancelled 5th month in a row, transition to community leadership (FreeGeek hired DEI coordinator)
* FreeGeek - inviting Russell for virtual coffee (previous scheduled meetings have failed)
* MOU - still not agreed to (no funds given, training up in the air)
----
[CategoryMeetingNotes]