Differences between revisions 20 and 21
Revision 20 as of 2004-05-13 17:12:36
Size: 1090
Editor: DarrinEden
Comment: tersting
Revision 21 as of 2004-07-12 14:51:29
Size: 1059
Editor: 207
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
  * VictoriaPortAngelesParty
   * Complete site surveys by May
   * Assemble station by June
   * Finalize lodging, travel and beer+food by July
  * One Year Plan with Operating Budget (Finance Team)
    * First Draft by August
    * Final Draft by September
  * PersonalTelcoUniversity
    * Lay out curriculum by November
    * Meeting of first class by January
Line 26: Line 28:
 * [http://wireless.sf.net/ wireless.sf.net]
  * Determine project scope and direction regarding content

Darrin Eden

[http://www.google.com/search?hl=en&lr=&ie=UTF-8&oe=UTF-8&q=quantum+flux+analog+digital Flux Quantum Analog to Digital]

Dynamic Range.

Contact Information

president@personaltelco.net BR (503) 539-2284 BR http://www.decentric.org/ BR http://weblog.decentric.com/ BR

Scheduled Projects

  • PersonalTelco

    • One Year Plan with Operating Budget (Finance Team)
      • First Draft by August
      • Final Draft by September
    • PersonalTelcoUniversity

      • Lay out curriculum by November
      • Meeting of first class by January
    • ParkToPark

      • Develop logistics for sixteen similarly equipped pods
      • Find map to locate possible gathering points
  • GnuRadio

    • Resolve driver inconsistencies

Personal Telco Node

["Node264"]

GeoWiki('address','2155.NW.Glisan.St.Portland.OR.97210')

GeoWiki('near','1','miles')

MoinMap('address','2155.NW.Glisan.St.Portland.OR.97210')

Page Contributions

FullSearch()


[CategoryHomepage]

DarrinEden (last edited 2008-11-26 22:55:53 by S0106001b63f3cdd5)