Differences between revisions 14 and 15
Revision 14 as of 2019-03-27 21:27:13
Size: 2499
Comment:
Revision 15 as of 2019-03-27 21:52:00
Size: 2630
Comment:
Deletions are marked like this. Additions are marked like this.
Line 36: Line 36:
 * I-990 and CT-12 filings are due May 15  * I-990 and CT-12 filings are due May 15y f
Line 38: Line 38:
 * OSCON booth requested, results May 2nd
 * Code 4 PDX - still need to reconnect - can it survey for municipal broadband PDX

Location: NodeLuckyLab
Date and Time: Wednesday, March 27, 2019, 6:30-8:00 p.m.
Scribe: You
Roll Call: RussellSenior,JasonBergstrom,TedBrunner,SteveTree,Andy

Agenda

  • Node notes:
    • NodeSechzig -- report on fixage

    • NodeSherrett -- report on installage

    • NodeMcMaster -- back online with flash-mod'd WDR3600

    • NodeGreenNoise -- closing, conclusively non-node after uncertain downage of several years, MR24 recovered.

    • NodeArborLodge -- down due to unresolved ISP outage, switching in disgust over poor customer service, back soonish.

    • NodeWeidler -- offline, possibly due to a billing issue.

    • NodeMeadow and NodeRoxy -- waiting to be plugged in in Rainier.

  • Purchased 16 Meraki MR24s, arrived, think about automation of flashing process, e.g. with expect
  • Reply (finally) from Pioneer Courthouse Square management, after some pestering (actually missed the call and need to return the call)
  • <add-your-agenda-item-here>

Notes

  • Node notes:
  • Russell received MR24s, need security screws
  • Discussion about chat script to aid with flashing MR24s
  • Issue with Ubiquiti bullets that think the ethernet port is gigabit, Russell tested failure rate is ~28%, script in place to restart if issue appears, OpenWRT tried last Summer to resolve, only issue if upstream is gig
  • Russell bulged the battery in his Chui, can't ship him a replacement
  • Jason manually renewed cert on knod on Monday, but also found issues with syslog-ng config (put in default - many old unsupported JMC mods to previous not integrated). Still not sure on anacron issue, but at least now logging.
  • Next week's meeting is at NodeLuckyLabNorth

  • Discussion about VLAN on nodes at NodeSechzig

  • I-990 and CT-12 filings are due May 15y f
  • Board nominations open, elections in July
  • OSCON booth requested, results May 2nd
  • Code 4 PDX - still need to reconnect - can it survey for municipal broadband PDX

---

[CategoryMeetingNotes]

MeetingMarch2019 (last edited 2019-03-27 21:52:00 by JasonBergstrom)