Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2004-11-11 12:39:17
Size: 826
Editor: sub20-147
Comment:
Revision 3 as of 2004-11-13 19:12:48
Size: 1107
Editor: sub20-147
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
* Meyer Deadline Jan 15th. Answer within 3 mo.
* Rooftop on N. Mississippi 4000 block
* Requesting 6 MB DSL line donation (ISP to be announced)
* VoIP phones in local businesses, other community gathering places
* Community message board and other network services
* Metrix or similar solution as backbone
* AaronBaer will be lead for getting all tech info worked out
* MichaelWeinberg will write grant proposal and oversee execution
* Grant will be for 1 year, with first 6 mo. dedicated to buildout and last 6 mo. for tweaking and community education/outreach.
 * Meyer Deadline Jan 15th. Answer within 3 mo.
 * Rooftop on N. Mississippi 4000 block
 * Requesting 6 MB DSL line donation (ISP to be announced)
 * VoIP phones in local businesses, other community gathering places
 * Community message board and other network services
 * Metrix or similar solution as backbone
 * AaronBaer will be lead for getting all tech info worked out
 * MichaelWeinberg will write grant proposal and oversee execution
 * Grant will be for 1 year, with first 6 mo. dedicated to buildout and last 6 mo. for tweaking and community     education/outreach. -MichaelWeinberg 11/11/04
Line 15: Line 15:
-MichaelWeinberg 11/11/04 Site survey was done this morning. Plan to use a 3 radio antenna array mounted on a chimney. Currently two rooftops are in play: one as the anchor point and wired backhaul location, and the other for wireless backhaul to extend the coverage. -MichaelWeinberg 11/13/04

This page will serve as a central repository for proposals and decisions regarding our upcoming grant proposal. Please date your thoughts and leave your name. -MichaelWeinberg

At Hack Night, the following was outlined:

  • Meyer Deadline Jan 15th. Answer within 3 mo.
  • Rooftop on N. Mississippi 4000 block
  • Requesting 6 MB DSL line donation (ISP to be announced)
  • VoIP phones in local businesses, other community gathering places
  • Community message board and other network services
  • Metrix or similar solution as backbone
  • AaronBaer will be lead for getting all tech info worked out

  • MichaelWeinberg will write grant proposal and oversee execution

  • Grant will be for 1 year, with first 6 mo. dedicated to buildout and last 6 mo. for tweaking and community education/outreach. -MichaelWeinberg 11/11/04

Site survey was done this morning. Plan to use a 3 radio antenna array mounted on a chimney. Currently two rooftops are in play: one as the anchor point and wired backhaul location, and the other for wireless backhaul to extend the coverage. -MichaelWeinberg 11/13/04

MississippiGrantProject (last edited 2008-03-15 12:32:25 by JasonMcArthur)