| Line 11: | Line 11: |
|
* 2003 March 25, AaronJohnson DaveJensen Moved CAB into the rafters. One long cross over cable runs from the DSL modem up to the CAB. You'll need a ladder to power cycle if it goes haywire. |
Node375Log documents all changes and/or maintenance performed on the node. Comments the engineer or others might have regarding the event are appreciated.
Use this to avoid stepping on each others toes.
Note: use the page BeWitchedInfo to note the information you will need to make the final configuration.
- 2003 March 19, Brian Beattie
Installed BeWitched 0.2 beta (Nancy), for convience this was done by installing on a second CAB and the radio was moved from the old hardware to the new. As usual I did not remember all the information that the new box needed.
2003 March 25, AaronJohnson DaveJensen
- Moved CAB into the rafters. One long cross over cable runs from the DSL modem up to the CAB.
You'll need a ladder to power cycle if it goes haywire.