Differences between revisions 4 and 7 (spanning 3 versions)
Revision 4 as of 2003-09-09 22:21:34
Size: 1894
Editor: 216-99-217-22
Comment:
Revision 7 as of 2005-03-09 09:21:29
Size: 1961
Editor: WikiMinion
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Role call: BrianBeattie TomOffermann TomFitzgerlad RobertPetersen  * Role call: BrianBeattie TomOffermann TomFitzgerald RobertPetersen
Line 18: Line 18:
Line 23: Line 24:
Line 27: Line 27:
Measuring bandwidth usage: http://www.personaltelco.net/mrtg. TomOffermann has set up measuring for three nodes: Pioneer Square, Urban Grind, S. Park Blocks. Need to add more nodes in the future.
Line 28: Line 29:
Tom Offermann
remote login: http://www.personaltelco.net/mrtg
three nodes PS, UG, S.Park blcks are working. Need to add nodes
tunneling was discussed, no conclusions.
Tunneling was discussed, no conclusions.

Meeting Details

Old Business

New Business

Resolved Items and Notes

localcontent: Managed nodes that are operated by the owner should be supported in having local content. The issue remains the reliability of those nodes not directly under the control of either a PTP member or easily accessible by the Ops team.

nodeaudit: Don unavailable. Carries forward to next meeting.

IPv6: Security advantages and general consensus that all the nodes need to be standardized first. RobertPetersen takes the stance that someone needs to do the R&D.

Measuring bandwidth usage: http://www.personaltelco.net/mrtg. TomOffermann has set up measuring for three nodes: Pioneer Square, Urban Grind, S. Park Blocks. Need to add more nodes in the future.

Tunneling was discussed, no conclusions.

static page updates: Look is ok. Need for the node link to be changed back to hotspots on the top navigation bar. The top of the hotspots page should have a link to the section "Wireless Networking" contained on: http://www.personaltelco.net/static/getinvolved.html.

Next Meeting: The need for an ops. team. Updating the Wiki to v 1.0, backups.

Next Meeting Details

  • Location:
  • Date: 16 Sep 2003
  • Planned Start Time: 6:30PM
  • Facilitator:
  • Scribe:


[CategoryMeetingNotes]

WeeklyMeeting20030909 (last edited 2007-11-23 18:02:50 by localhost)