Differences between revisions 4 and 5
Revision 4 as of 2006-06-14 18:57:12
Size: 1584
Editor: DonPark
Comment:
Revision 5 as of 2006-06-14 19:03:18
Size: 1786
Editor: DonPark
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 * mississippi: naya roof needs another ethernet run, or couple a run to SE corner cisco (disconnected). ed's roof needs to be repointed at commons and check hpol and vpol. caleb needs a dry day to get on that roof. grand central roof needs to be installed, either get conduit to rooftop or weatherproof connection to existing rooftop outlets. altura roof needs power on the roof, plus commons needs a 4 foot raise.  * mississippi: naya roof needs another ethernet run, or couple a run to SE corner cisco (disconnected). ed's roof needs to be repointed at commons and check hpol and vpol. caleb needs a dry day to get on that roof. grand central roof needs to be installed, either get conduit to rooftop or weatherproof connection to existing rooftop outlets. altura roof needs power on the roof, plus commons needs a 4 foot raise. Ben is available June 28&29 for missip work.
Line 24: Line 24:
 *  * Communitecture needs a switch installed to get remote access to the nucab
 * next weekly at the red&black to restore setup of that location to PTP standards

Location: ["Node564"] Ugly Mug Coffeehouse BR Date and Time: 6:30 pm, June 14th 2006BR Scribe: DonPark BR Roll Call: DonPark BenjaminJencks DavidJencks RussellSenior CalebPhillips BR

Agenda

  • Discuss NodeHollywood remaining todos

  • Reminder: come see Humaninet's [http://humaninet.org/events.html Simulation Day] June 15th

  • Election process, nominating period.
  • Communitecture update
  • Red and Black update
  • Schedule next mississippi action

Notes

  • implemented a work-around for DNS problem with nucab box
  • caleb gives lecture on 802.11 spread-spectrum.
  • haskell is generally agreed to be the bizomb that only the l33t c0d3rs use.
  • david and russell reminisce about the good old days of lisp.
  • Hollywood: ethernet cable to office has been run after a visit that lasted until 2am. nocat configuration was difficult with three interfaces. some zip-tie'ing left to do
  • mississippi: naya roof needs another ethernet run, or couple a run to SE corner cisco (disconnected). ed's roof needs to be repointed at commons and check hpol and vpol. caleb needs a dry day to get on that roof. grand central roof needs to be installed, either get conduit to rooftop or weatherproof connection to existing rooftop outlets. altura roof needs power on the roof, plus commons needs a 4 foot raise. Ben is available June 28&29 for missip work.

  • ptp flag - cloth flag to fly from omni antennas
  • Russell is the nominating committee; Russell will email the general list opening the nominating period that closes with the june monthly meeting.
  • Communitecture needs a switch installed to get remote access to the nucab
  • next weekly at the red&black to restore setup of that location to PTP standards

WeeklyMeeting20060614 (last edited 2007-11-23 18:01:03 by localhost)