Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2010-06-03 10:07:31
Size: 355
Comment:
Revision 3 as of 2010-06-09 21:16:35
Size: 1625
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
'''Scribe:''' You<<BR>>
'''Roll Call:''' Them<<BR>>
'''Scribe:''' RussellSenior<<BR>>
'''Roll Call:''' GregMoore, RussellSenior, MarinoDuregon, SaraHonsberger, SteveTree<<BR>>
Line 10: Line 10:
 * Discuss status of SkyPilot storage plan
  * locations available
  * improve mothballing with electrical tape over sensitive openings?
  * dealing with the extra bits
Line 14: Line 18:
 * None Yet  * Discussed next steps on the WoodstockWifiProject, including determining costs, if any, for internet backhaul, then begin polling businesses to see if the necessary budget, if any, can be pulled together.
 * Discussed where the first batch of devices were stored, logistics for doing so, what other storage is available, what we need for packing up more stuff, places, etc.
  * We anticipate roughly 130 devices in the near term, with maybe more in the future.
  * We can easily handle storage of the 130 with current storage resources.\
  * We need to seal up the "vulnerable" openings of the SkyPilots, in particular, covering the N connectors and the cat5 entry to prevent bugs from fouling (already found one device that had been colonized by ants).
  * Will need to get packing boxes for some of the other hardware:
   * street light power tap cords
   * poe injector enclosures
   * mounting masts
   * 12V batteries (from gateway enclosures)
   * bracket parts
   * miscellaneous fasteners
 * (add your notes here)

Location: Vertigo Pub, 4260 SE Hawthorne
Date and Time: Wednesday, June 9, 2010, 6:30pm-8:00pm
Scribe: RussellSenior
Roll Call: GregMoore, RussellSenior, MarinoDuregon, SaraHonsberger, SteveTree

Agenda

  • Pick location for next weekly
  • Discuss status of WoodstockWifiProject

  • Discuss status of SkyPilot storage plan

    • locations available
    • improve mothballing with electrical tape over sensitive openings?
    • dealing with the extra bits
  • Your Item Here

Notes

  • Discussed next steps on the WoodstockWifiProject, including determining costs, if any, for internet backhaul, then begin polling businesses to see if the necessary budget, if any, can be pulled together.

  • Discussed where the first batch of devices were stored, logistics for doing so, what other storage is available, what we need for packing up more stuff, places, etc.
    • We anticipate roughly 130 devices in the near term, with maybe more in the future.
    • We can easily handle storage of the 130 with current storage resources.\
    • We need to seal up the "vulnerable" openings of the SkyPilots, in particular, covering the N connectors and the cat5 entry to prevent bugs from fouling (already found one device that had been colonized by ants).

    • Will need to get packing boxes for some of the other hardware:
      • street light power tap cords
      • poe injector enclosures
      • mounting masts
      • 12V batteries (from gateway enclosures)
      • bracket parts
      • miscellaneous fasteners
  • (add your notes here)


[CategoryMeetingNotes]

WeeklyMeeting20100609 (last edited 2010-06-09 21:16:35 by RussellSenior)