Differences between revisions 5 and 8 (spanning 3 versions)
Revision 5 as of 2011-09-07 18:00:35
Size: 657
Comment: basement pub closed for cleaning/repair or something, relocated to luckylab
Revision 8 as of 2011-09-08 08:17:04
Size: 2100
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
'''Scribe:''' You<<BR>>
'''Roll Call:''' Them<<BR>>
'''Scribe:''' RussellSenior<<BR>>
'''Roll Call:''' KeeganQuinn, DatNguyen, RussellSenior<<BR>>
Line 19: Line 19:
 * None Yet  * Russell was delayed arriving, Keegan and Dat discovered that the original location was closed for remodelling or something, relocated to NodeLuckyLab at about 6:50 pm. Subsequently learned that we missed CharlesHill, an attendee from the previous week. Hopefully next week will work better.
 * Dat had a suggestion about PersonalTelco doing hardware reviews through SamChurchill dailywireless.org. Russell indicated a willingness to consider such an arrangement.
 * Russell mentioned the recent, impending domain name expirations. Keegan suggested we renew everything for 10 years.
 * Russell mentioned that we have the flange adapters ready to go, need to know what other mounting hardware is needed for ArborLodge.
 * Russell provided a WGT634U, wallwart (formerly of NodeDragonfly) and a USB-serial cable to Keegan for FooCab firmware development work.
 * Russell mentioned the impending Broadband Strategic Plan session at the City Council next week, September 14th.
 * Russell and Keegan discussed how we might do ipv6 tunnels to all the nodes using our /48 allocation from HurricaneElectric. Russell pointed out that all the ipv6 traffic would get funneled through donk at this point, which seemed suboptimal. Iris was mentioned as an alternative. Maybe not a problem at this point, due to relatively light ipv6 utilization.
 * <other things that I am now not remembering, please correct>

Location: NodeLuckyLab
Date and Time: Wednesday, September 7, 2011, 6:30pm-8:00pm
Scribe: RussellSenior
Roll Call: KeeganQuinn, DatNguyen, RussellSenior

Agenda

  • Pick location for next weekly
  • Domain name renewal:
    • personaltelco.org renewed by TylerBooth until this time 2012

    • personaltelco.net expiring in November
    • personaltelco.com sometime in 2012
  • more SkyPilot flange adapters fab'd, can do three more installations + a spare

  • Deliver a Netgear WGT634U and a serial console cable to KeeganQuinn for development and testing

  • Your Item Here

Notes

  • Russell was delayed arriving, Keegan and Dat discovered that the original location was closed for remodelling or something, relocated to NodeLuckyLab at about 6:50 pm. Subsequently learned that we missed CharlesHill, an attendee from the previous week. Hopefully next week will work better.

  • Dat had a suggestion about PersonalTelco doing hardware reviews through SamChurchill dailywireless.org. Russell indicated a willingness to consider such an arrangement.

  • Russell mentioned the recent, impending domain name expirations. Keegan suggested we renew everything for 10 years.
  • Russell mentioned that we have the flange adapters ready to go, need to know what other mounting hardware is needed for ArborLodge.

  • Russell provided a WGT634U, wallwart (formerly of NodeDragonfly) and a USB-serial cable to Keegan for FooCab firmware development work.

  • Russell mentioned the impending Broadband Strategic Plan session at the City Council next week, September 14th.
  • Russell and Keegan discussed how we might do ipv6 tunnels to all the nodes using our /48 allocation from HurricaneElectric. Russell pointed out that all the ipv6 traffic would get funneled through donk at this point, which seemed suboptimal. Iris was mentioned as an alternative. Maybe not a problem at this point, due to relatively light ipv6 utilization.

  • <other things that I am now not remembering, please correct>


[CategoryMeetingNotes]

WeeklyMeeting20110907 (last edited 2011-09-08 08:17:04 by RussellSenior)