 * Portland Clean Energy Fund - date missed this year
 * Municipal Broadband PDX - still working over response, hope to have complete at end of week
 * Meet next Wednesday/December?

Location: Jitsi
Date and Time: Wednesday, November 18, 2020, 6:30pm-8:00pm
Scribe: You
Roll Call: RussellSenior,TedBrunner,SteveTree,JasonBergstrom,TomasKuchta

Agenda

  • Pick location for next weekly
  • Node notes:
    • NodeMississippi -- ramping up for an install attempt this Saturday, bath bar has paint applied.

    • NodeStreetRoots -- need to follow up to schedule a visit

    • NodeKlickitat -- upgraded an ancient WGT634U to a WDR3600 for one of the mesh participants today

  • OpenVPN report, follow up from last week
    • Devices that are currently reachable were repointed at drei
    • Some devices are offline, we should probably leave iris as is until the offline nodes can be reconnected
    • Beginning to experiment with modified configuration:
      • multiple openvpn server targets for automatic fail-over (works-ish);
      • ipv6 configuration is complicated:
        • there are different prefixes for each server;
        • we want to use native ipv6 when it's available;
        • when it isn't available, we want to use our tunnel and dynamically routed via olsrd or equivalent;
        • we'd like to be able to use the tunnel when reaching other similar prefixed node addresses;
        • when olsrd is running for ipv6, it's stealing the default route via a low metric, which isn't really what we want;
        • there are some warts in the way olsrd configuration works currently which i'm working out, maybe by abandoning it.
        • i have a babeld configuration for nodes, but not yet for the servers (iris, drei, knod), needs more experimentation.
  • BattleMesh -- debrief from Ted and Russell (latter really only was able to participate post-hoc via recorded stream)

  • PCEngines Group Order has been submitted, delivery expected in roughly a week to 10 days.
  • Node Brunner - shift to APU2?
  • Your Item Here

Notes

  • Node notes:
    • NodeMississippi - Attachment bar painted, likely Saturday event, pending hauling 16' of ladder.

      • Node contact will not be there, also need temporary 12v to test aiming antenna.
      • 1pm, maybe 1.5 hours
    • NodeStreetRoots - haven't heard from since end of October, need to contact again

    • NodeKlickitat - widgets had limited SoC capacity, Russell will cycle other widgets out over time

  • BattleMesh - Ted caught Saturday youtube stream over several hours, and Sunday early with no time-shifting, would've preferred to talk directly to presenters, but did comment in chat.

  • PCEngines - most items cheaper than list, but also 2 UPS import charges expected
  • Portland Clean Energy Fund - date missed this year
  • Municipal Broadband PDX - still working over response, hope to have complete at end of week
  • Meet next Wednesday/December?


[CategoryMeetingNotes]