Differences between revisions 8 and 10 (spanning 2 versions)
Revision 8 as of 2021-09-22 16:59:57
Size: 1161
Comment:
Revision 10 as of 2021-09-22 17:10:22
Size: 1488
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
  * NodeSuzette - Integra wanted to replace DSL modem Tuesday and static IP would change. IP did change at 4am so there was downtime. Integra called Russell to update params.
 * Still need to replace battery on magenta at WiLine
 * DNSimple will be moving domain registration between 9/23 and 12/1 where we need to approve.

Location: Jitsi
Date and Time: Wednesday, September 22, 2021, 5:30pm-8:00pm
Scribe: You
Roll Call: RussellSenior,TomasKuchta,JasonBergstrom,MatthewKlug

Agenda

  • Pick location for next weekly
  • Node notes:
    • VZA Homes decommissioning -- Russell requested VZA that we do this on the coming Saturday, 9/25.
    • NodeTibbetts -- had an outage related to a power outage and corrupted NAND flash. Reflashing fixed it, but rendered the device unbootable until recovered. Considering switching to an APU2 there.

    • NodeStreetRoots -- try to set up a time

    • NodeSherrett -- try to set up a time

  • Your Item Here

Notes

  • Node notes:
    • VZA Nodes - have permission to visit this Saturday, will prioritize tennant contact and roof access decommissions.
    • NodeTibbetts - power outage last weekend, Russell replaced ERX, and failed one was able to be reloaded. Will replace will APU2 to have better reliability.

    • NodeStreetRoots and NodeSherrett - need to contact.

    • NodeSuzette - Integra wanted to replace DSL modem Tuesday and static IP would change. IP did change at 4am so there was downtime. Integra called Russell to update params.

  • Still need to replace battery on magenta at WiLine

  • DNSimple will be moving domain registration between 9/23 and 12/1 where we need to approve.


[CategoryMeetingNotes]

WeeklyMeeting20210922 (last edited 2021-09-22 17:49:04 by JasonBergstrom)