← Revision 8 as of 2021-09-22 16:59:57
Size: 1161
Comment:
|
← Revision 9 as of 2021-09-22 17:04:21 →
Size: 1337
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 22: | Line 22: |
* NodeSuzette - Integra wanted to replace DSL modem Tuesday and static IP would change. IP did change at 4am so there was downtime. Integra called Russell to update params. |
Location: Jitsi
Date and Time: Wednesday, September 22, 2021, 5:30pm-8:00pm
Scribe: You
Roll Call: RussellSenior,TomasKuchta,JasonBergstrom,MatthewKlug
Agenda
- Pick location for next weekly
- Node notes:
- VZA Homes decommissioning -- Russell requested VZA that we do this on the coming Saturday, 9/25.
NodeTibbetts -- had an outage related to a power outage and corrupted NAND flash. Reflashing fixed it, but rendered the device unbootable until recovered. Considering switching to an APU2 there.
NodeStreetRoots -- try to set up a time
NodeSherrett -- try to set up a time
Your Item Here
Notes
- Node notes:
- VZA Nodes - have permission to visit this Saturday, will prioritize tennant contact and roof access decommissions.
NodeTibbetts - power outage last weekend, Russell replaced ERX, and failed one was able to be reloaded. Will replace will APU2 to have better reliability.
NodeStreetRoots and NodeSherrett - need to contact.
NodeSuzette - Integra wanted to replace DSL modem Tuesday and static IP would change. IP did change at 4am so there was downtime. Integra called Russell to update params.