Differences between revisions 7 and 8
Revision 7 as of 2024-05-15 18:02:00
Size: 1635
Comment:
Revision 8 as of 2024-05-15 18:08:47
Size: 1900
Comment:
Deletions are marked like this. Additions are marked like this.
Line 41: Line 41:
  * NodeMockingbird - San Diego, interested in placing in theatre/co-working deployment, with custom splash page for marketing
    * Russell pointed to HW for purchase, + ship from Portland
Line 43: Line 45:
* PO Box renewal - will run card on file (Union bank, will not succeed)

Location: NodeGooseHollow
Date and Time: Wednesday, May 15, 2024, 6:30pm-8:00pm
Scribe: You
Roll Call: RussellSenior,JasonBergstrom

Agenda

  • Pick location for next weekly
  • Node notes:
    • Survey of APs with old hostkeyalgorithms, updated firmware:
      • ap1.tibbetts.ptp
      • ap2.edison.ptp
      • ap3.edison.ptp
      • sta1.smart.ptp
      • ap1.ecotrust.ptp
      • ap2.ecotrust.ptp
      • ap1.streetroots.ptp
      • ap2.streetroots.ptp
      • ap1.luckylabsw.ptp
      • ap2.luckylabsw.ptp
    • Not updated:
      • ap1.kellogg.ptp
      • ap2.kellogg.ptp
      • ap1.edison.ptp
      • metrix-west.missnet.ptp
      • ap2.firstunitarian.ptp
    • NodeLuckyLab -- outage, now restored

    • NodeSmart -- outage, needs a power cycle or checking on cable connections

    • NodeEdison -- contacted by a new tenant looking to get better internets in their apartment

    • NodeMockingBird -- possible new node in San Diego

    • NodeFirstUnitarian -- rooftop metrix box had its regular AP-mode interfaces turned off, communicating with it over the mesh.

  • ARPA Grant update
  • PO Box renewal
  • Your Item Here

Notes

* Russell's neighbor on NE 24th had a down fiber run (intact, but cut due to on the street) * Node notes

  • NodeFirstUnitarian - able to be connected to over mesh, Russell intentionally disconnected the ether interface - it has power.

  • NodeMockingbird - San Diego, interested in placing in theatre/co-working deployment, with custom splash page for marketing

    • Russell pointed to HW for purchase, + ship from Portland

* ERX firmware rebuild is failing, possibly due to size? * Ubiquiti 32MB devices are too small to host our image any longer, Russell looked for XW/64MB gear on Ebay but didn't find any * PO Box renewal - will run card on file (Union bank, will not succeed)


[CategoryMeetingNotes]

WeeklyMeeting20240515 (last edited 2024-05-15 19:09:52 by JasonBergstrom)