Location: NodeLuckyLabNW
Date and Time: Wednesday, January 28, 2026, 6:30-8:00 p.m.
Scribe: You
Roll Call: JasonBergstrom,TedBrunner,RussellSenior
Agenda
Review ToDoList2026 for any updates/notes
- Node notes:
NodeEcotrust -- currently offline, trying to reach ecotrust staff to okay electrical closet access
NodeAlhambra -- E8450 is now integrated into the network as ap3. Old ap3 is now a not-plugged-in ap8.
NodeGriswold -- we've had some ap outages, unable to reach either ap1 or ap2, cured by rebooting the gateway, whut?
NodeHayduke -- might have mentioned this before, there was an outage of a few days, after node was unplugged because it felt hot, plugged back in.
NodeMississippi -- unknown brief to longer outages.
- 1099-INT received from OnPointCU: $12.87 for 2025
- Do we need to implement LLM-scraper bot protection with anubis or ??
- Cacti issues
- Futel -- we have an invoice for 2025 we need to review and approve or interrogate
- Your update here!
Notes
- Node notes
NodeMississippi - issues with bullet on Aarons, Russell rebooting
NodeEcotrust - Russell stopped by, but need access to closet, and looking for a contact.
- No upstream, needs visual to find whether this was a physical disconnect, and what sort.
NodeAlhambra - plugged in E8450 as a replacement for AP3
- E8450s no longer cheap, no replacement WIFI6 model found so far
NodeGriswold - APs (both 1 and 2 have had problems), rebooting the gateway fixed
- E8450 gateway
NodeHayduke - heat issue, unplugged and replugged
- 1099-INT, will be incorporated into 990 postcard filing
- Discussion about tarpit software for wikipedia
- Futel reimbursement from 2025, Paetron reimbursement still needs some review
- employee reimbursement for 2025 maxed out at $600
- concern about paying for storage space as well, compare to commercial storage rates
- also expecting another grant ~$500 from another East Portland entity
- Jason still looking at Cacti, probably do need a compiled spine

