Here are some things that we need to do to get the SatelliteTruck ready for operation.
Left To Do:
- Change the tires (store studded tires for winter time)
- Change the oil
- Replace control cable in the coil with CAT5 cables
- Aquire and mount a weatherproof box on the mast for APs
- Remove all unneeded cabling. video, power, etc.
- Check electrical connections, and re-do where necessary. (Like mast lowering control)
- Check generator mounting, it sounds loose
- Mount switch in rack and wire to jacks inside and outside (Adam don't you have a rack mount switch for us?)
Done:
- Purchase the van
- Do a quick once over