Differences between revisions 2 and 3
Revision 2 as of 2018-08-27 22:58:29
Size: 687
Comment: add a note about repair needs at Buffalo Gap
Revision 3 as of 2018-08-27 23:00:58
Size: 784
Comment: corporate renewal paid
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * Russell notes that he paid the Oregon corporate renewal ($50) only a week or so late (oops).

Location: NodeLuckyLab
Date and Time: Wednesday, August 29, 2018, 6:30-8:00 p.m.
Scribe: You
Roll Call: Them

Agenda

  • Node notes:
    • NodeStreetRoots -- offline due to ISP change, need to make contact with node host to arrange fixup.

    • NodeBuffaloGap -- install a Ubiquiti ER-X in place of the Alix for better bandwidth, also needs an ethernet tip replaced (due to lost tab)

    • NodeAnkenyTap -- review status

  • Russell describes status of ubifs write-back problem investigation (applies to both mr24 and er-x)
  • Russell notes that he paid the Oregon corporate renewal ($50) only a week or so late (oops).
  • Russell tells of his road trip adventures

Notes

  • None Yet


[CategoryMeetingNotes]

MeetingAugust2018 (last edited 2018-08-30 09:13:20 by 97-115-235-132)