← Revision 3 as of 2003-08-05 21:08:03
Size: 874
Comment:
|
← Revision 4 as of 2003-08-05 21:11:40 →
Size: 979
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Pigtail U.FL/MHF to RP-TNC 2-hole panel mount (1) * 5.0 dBi Rubber Duck Antenna with RP-TNC connector(1) |
* Pigtail U.FL/MHF to RP-TNC 2-hole panel mount * 5.0 dBi Rubber Duck Antenna with RP-TNC connector |
Line 20: | Line 20: |
* Address: * Gateway: |
* Address: 130.94.161.250 * Gateway: 130.94.161.1 |
Line 31: | Line 31: |
* | * 2003-08-04 - AP installed and cabling run. Waiting now for Qwest to deliver DSL CPE. |
Node name: The Coffe PlantBR Node Info: NodeId:518 BR Live Date: August 4, 2003 BR Sponsor: The Coffee Plant BR Contact: WilCooley
Equipment Donated
All equipment purchased by [http://www.coffeeplant.net The Coffee Plant]
- Soekris 4521
SanDisk CompactFlash, 64MB
- EL-2511MP PLUS Mini PCI card
- Pigtail U.FL/MHF to RP-TNC 2-hole panel mount
- 5.0 dBi Rubber Duck Antenna with RP-TNC connector
Software Installed
- WISP-Dist
Network Topology
- Address: 130.94.161.250
- Gateway: 130.94.161.1
- Wireless Address: 10.11.30.1
- Wireless Network: 10.11.30.0/24
- DHCP Pool: 10.11.30.64 - .127
- ESSID: www.personaltelco.net
Installers / Organizers
Maintenance and System Log
- 2003-08-04 - AP installed and cabling run. Waiting now for Qwest to deliver DSL CPE.