Differences between revisions 10 and 12 (spanning 2 versions)
Revision 10 as of 2023-08-09 21:23:52
Size: 3071
Comment:
Revision 12 as of 2023-08-09 21:32:19
Size: 3357
Comment:
Deletions are marked like this. Additions are marked like this.
Line 38: Line 38:
 * NodeNotes:
  * NodePatch- Now running Linksys, interest in supporting groups trying to further these isolated stories.
  * NodeKailash - swapped out one older AP with MR24
  * NodeBuffaloGap - want 2.5GHz bandwidth inbound, but also AP near front (West/South bars)
 * ARPAGrant

Location: Double Mountain Overlook, 1700 N Killingsworth Street
Date and Time: Wednesday, August 9, 2023, 6:30pm-8:00pm
Scribe: JasonBergstrom
Roll Call: TedBrunner,JasonBergstrom,RussellSenior,MatthewKlug,SteveTree,JonArmani.

Agenda

  • Annual Board Meeting:
    • Select officers for the coming year
    • Other business
  • Node notes:
    • NodePatch -- replaced the Buffalo WZR600DHP with a Linksys E8450 802.11ax dual band device, discussing adding an outdoor device on the north side of the house, MichaelRasmussen is purchasing us a GS1900-10HP managed PoE switch to thank us for networking help

    • NodeKailash -- we provided an MerakiMR24 to replace an old 802.11g router, as first stage in an upgrade of their community wireless network, along with a wall wart power supply, billed them $25 for gear.

    • NodeBuffaloGap -- they are upgrading their network again to a 2gig/100megabit service, inquired whether our gateway can handle that, Russell suggested we could by replacing the gateway and APs with Linksys E8450s (which have 2.5gbps ethernet) at $100/whack. host also inquired about improving coverage in the bar area, which would imply an additional device.

  • ARPA Grant update:
    • 8/4 meeting to discuss change order for needed entry to building on roof, additional data jacks on first floor wall
    • 8/8 meeting with LinkOregon

  • Report on call with Vancouver Mesh network person
  • Oregon Broadband 5 year action plan draft: https://www.oregon.gov/biz/Publications/Broadband/DRAFT_BEAD5yractionplan.pdf is accepting comments until 5pm August 11.

  • Banking: Russell got a letter and new debit cards from US Bank, will bring Ted's to the meeting.
  • Calendar upate:
    • We had discussed and tentatively planned a weekly meeting on August 23 at NodeKlickitat to disassemble the last of the SkyPilots, but Russell was reminded we have a conflict that week and he: a) can't host; and b) can't attend, so different plans are needed.

  • Pick location for next weekly
  • Your Item Here

Notes

  • Inquired about guest access at Double Mountain (not offered, but also noisy at meeting start time)
  • AnnualBoardMeeting - gaveled in at 7:25pm, RussellSenior motion, TedBrunner seconded

    • Appointed: MatthewKlug,SteveTree,JonArmani to board of advisors

    • Officers are to remain status quo: RussellSenior:President, TedBrunner:Treasurer, JasonBergstrom:Secretary

    • Discussed expanding board, RussellSenior suggested it could happen in the future if the fit is right

    • Mission statement - JasonBergstrom will review and bring any recommendations to board for future meeting

    • IRS considers us an educational non-profit
  • AnnualBoardMeeting - gaveled out at 7:46pm. Motion by RussellSenior, seconded by TedBrunner

  • NodeNotes:

    • NodePatch- Now running Linksys, interest in supporting groups trying to further these isolated stories.

    • NodeKailash - swapped out one older AP with MR24

    • NodeBuffaloGap - want 2.5GHz bandwidth inbound, but also AP near front (West/South bars)

  • ARPAGrant


[CategoryMeetingNotes]

WeeklyMeeting20230809 (last edited 2023-08-10 03:37:44 by JasonBergstrom)