Differences between revisions 14 and 15
Revision 14 as of 2023-08-09 22:08:37
Size: 3572
Comment:
Revision 15 as of 2023-08-10 03:37:44
Size: 4649
Comment:
Deletions are marked like this. Additions are marked like this.
Line 39: Line 39:
  * NodePatch- Now running Linksys E9450,. Want to be involved for end users
  * NodeKailash - swapped out one older AP with MR24
  * NodeBuffaloGap - want 2.5GHz bandwidth inbound, but also AP near front (West/South bars)
  * NodePatch - Now running Linksys E9450. Future outdoor AP, purchased us a Xyxel 10 port switch with PoE
  * NodeKailash - swapped out one older AP with MR24 and new wall wart, will reimburse $25, another 10 to replace, we'd like to be involved with Anapurna when that gets going
  * NodeBuffaloGap - want 2.5GHz bandwidth inbound so replace core router, but also new AP near front (West/South bars) as customers reported 50% coverage
Line 43: Line 43:
  * WestEmailAddr/VB - changing Members/constiution
 * Need to stage stuff at Clack AMI
 * Need top image stuff w/wa amazon Mail/ADDRS
  * Ted/Russell meeting Friday at SOJ - need to complete statement of work/change order Thursday 8/10 for conduit and drop locationsns
  * Roof plan is main issue, currently 8' back from wall would not be great for APs, trellis could be an option, but need to paint black
  * Telco closet is second floor, spec 2A power, 2 data jacks on main floor by entrance 8'+ off floor
  * WiLine as provider is still default upstream (so far)
  * LinkOregon/AfroVillage/FreeGeek meeting
   * Pittock now charging per interconnect and megabit
   * Discussion on open networks and encrypted networks
   * ACP deployment in next year (points in grant for affordability)
 * Vancouver Mesh
  * "Just start deploying"
  * Draft broadband plan 142 pages
 * Banking - Ted now has new US Bank business card for period through May 2024
 * Next week online meeting - Jason may attend later
 * SkyPilot takeapart party was going to be 8/23 at Russell's, but conflict, so will also not have a meeting that week

Location: Double Mountain Overlook, 1700 N Killingsworth Street
Date and Time: Wednesday, August 9, 2023, 6:30pm-8:00pm
Scribe: JasonBergstrom
Roll Call: TedBrunner,JasonBergstrom,RussellSenior,MatthewKlug,SteveTree,JonArmani

Agenda

  • Annual Board Meeting:
    • Select officers for the coming year
    • Other business
  • Node notes:
    • NodePatch -- replaced the Buffalo WZR600DHP with a Linksys E8450 802.11ax dual band device, discussing adding an outdoor device on the north side of the house, MichaelRasmussen is purchasing us a GS1900-10HP managed PoE switch to thank us for networking help

    • NodeKailash -- we provided an MerakiMR24 to replace an old 802.11g router, as first stage in an upgrade of their community wireless network, along with a wall wart power supply, billed them $25 for gear.

    • NodeBuffaloGap -- they are upgrading their network again to a 2gig/100megabit service, inquired whether our gateway can handle that, Russell suggested we could by replacing the gateway and APs with Linksys E8450s (which have 2.5gbps ethernet) at $100/whack. host also inquired about improving coverage in the bar area, which would imply an additional device.

  • ARPA Grant update:
    • 8/4 meeting to discuss change order for needed entry to building on roof, additional data jacks on first floor wall
    • 8/8 meeting with LinkOregon

  • Report on call with Vancouver Mesh network person
  • Oregon Broadband 5 year action plan draft: https://www.oregon.gov/biz/Publications/Broadband/DRAFT_BEAD5yractionplan.pdf is accepting comments until 5pm August 11.

  • Banking: Russell got a letter and new debit cards from US Bank, will bring Ted's to the meeting.
  • Calendar upate:
    • We had discussed and tentatively planned a weekly meeting on August 23 at NodeKlickitat to disassemble the last of the SkyPilots, but Russell was reminded we have a conflict that week and he: a) can't host; and b) can't attend, so different plans are needed.

  • Pick location for next weekly
  • Your Item Here

Notes

  • Inquired about guest access at Double Mountain (not offered, but also noisy at meeting start time)
  • AnnualBoardMeeting - gaveled in at 7:25pm, RussellSenior motion, TedBrunner seconded

    • Appointed: MatthewKlug,SteveTree,JonArmani to board of advisors

    • Officers are to remain status quo: RussellSenior:President, TedBrunner:Treasurer, JasonBergstrom:Secretary

    • Discussed expanding board, RussellSenior suggested it could happen in the future if the fit is right, but we are also a working board, so position needs to be similar. Can revisit outside of AnnualBoardMeeting

    • Mission statement - JasonBergstrom will review and bring any recommendations to board for future meeting

    • IRS considers us an educational non-profit
  • AnnualBoardMeeting - gaveled out at 7:46pm. Motion by RussellSenior, seconded by TedBrunner

  • NodeNotes:

    • NodePatch - Now running Linksys E9450. Future outdoor AP, purchased us a Xyxel 10 port switch with PoE

    • NodeKailash - swapped out one older AP with MR24 and new wall wart, will reimburse $25, another 10 to replace, we'd like to be involved with Anapurna when that gets going

    • NodeBuffaloGap - want 2.5GHz bandwidth inbound so replace core router, but also new AP near front (West/South bars) as customers reported 50% coverage

  • ARPAGrant
    • Ted/Russell meeting Friday at SOJ - need to complete statement of work/change order Thursday 8/10 for conduit and drop locationsns
    • Roof plan is main issue, currently 8' back from wall would not be great for APs, trellis could be an option, but need to paint black
    • Telco closet is second floor, spec 2A power, 2 data jacks on main floor by entrance 8'+ off floor
    • WiLine as provider is still default upstream (so far)

    • LinkOregon/AfroVillage/FreeGeek meeting

      • Pittock now charging per interconnect and megabit
      • Discussion on open networks and encrypted networks
      • ACP deployment in next year (points in grant for affordability)
  • Vancouver Mesh
    • "Just start deploying"
    • Draft broadband plan 142 pages
  • Banking - Ted now has new US Bank business card for period through May 2024
  • Next week online meeting - Jason may attend later
  • SkyPilot takeapart party was going to be 8/23 at Russell's, but conflict, so will also not have a meeting that week


[CategoryMeetingNotes]

WeeklyMeeting20230809 (last edited 2023-08-10 03:37:44 by JasonBergstrom)