Differences between revisions 16 and 17
Revision 16 as of 2024-01-03 20:26:07
Size: 3022
Comment:
Revision 17 as of 2024-01-03 20:45:37
Size: 3096
Comment:
Deletions are marked like this. Additions are marked like this.
Line 43: Line 43:
  * FreeGeek - inviting Russell for virtual coffee (previous scheduled meetings have failed)   * FreeGeek - inviting Russell for virtual coffee (previous scheduled meetings have failed)
   * MOU - still not agreed to (no funds given, training up in the air)

Location: Jojo's 902 NW 13th
Date and Time: Wednesday, January 3, 2024, 6:30pm-8:00pm
Scribe: You
Roll Call: TedBrunner,JasonBergstrom,MatthewKlug,RussellSenior,JonArmani,SteveTree

Agenda

  • Pick location for next weekly
  • Node notes:
    • NodeAnnapurna -- A bunch of APs are plugged in, bridged with dumb switches. Ole is considering more APs to the additional stairwells, possibly another 5 MR24s. Some work done on Zyxel GS1900-24e switch firmware.

    • NodeBeulahLand -- is offline since early December, needs a visit

    • NodeWhet -- ISP transition report?

    • NodeLionsEye -- is offline since mid-December, needs a visit

    • NodeEcotrust -- needs a PoE injector for downstairs AP.

    • NodeAlhambra -- more adjustments, also moving towards a firmware refresh and vlan rationalization after initial experimental expansions

    • NodeBuffaloGap -- ap3 seems to be unreachable, will ping node host to see about a power cycle

    • NodeWhet -- upgraded from legacy DSL service to Quantum fiber (500Mbps symmetric) Very smooth process and install!

    • NodeBrunner -- request from tenant for better wifi for online classes. Move existing MR.24 AP closer to apt. which requires PoE. Router is APU2 with no free ethernet ports.

  • Gear disposal:
    • 7 lengths of LMR400 gifted to a contributor, they had been in the stockpile unused for most of Russell's involvement with PTP, since the mid-aughts, unlikely to ever use them, given modern PoE-powered radios.
    • other random detritus, e.g. ancient 802.11b Cisco APs, in pile to go to e-waste.
  • APRA Grant update -- no news, presumably due to holidays. still waiting on security-instrument specifications, MOU finalization.
  • Russell going to Seattle on Thursday, back by Friday evening if not earlier.
  • Your Item Here

Notes

  • Node notes:
    • NodeAnnapurna - Russell flashed 24 port (smart) switch, 7 APs deployed in 5 buildings, 1 facing into pool area, 1 in garage area. Issue on buildings with 3 stairwells can't reach AP from ends.

      • Would like 5 more APs
      • Has a drone, interested in placing AP in large cedar
      • Has given us check for 10 APs and Gateway
    • NodeBeulahLand - failing RJ45 connector tab

    • NodeLionsEye - off since mid December

    • NodeEcotrust - Russell has a replacement injector

    • NodeAlhambra - Needs vlan rationalization and firmware refresh

    • NodeBuffaloGap - AP3 unreachable

    • NodeWhet - transition off DSL to "Quantum" (cheaper and 500Mb symmetric)

    • NodeBrunner - Move AP to better improve access (but has to be outside of apartment)

  • Gear disposal - LMR400 multiple 10's of foot sections disposed of + CiscoAP (802.11b) shed, saved shelf space
  • ARPA Grant
    • DIN - mid-November meeting cancelled 5th month in a row, transition to community leadership (FreeGeek hired DEI coordinator)

    • FreeGeek - inviting Russell for virtual coffee (previous scheduled meetings have failed)

    • MOU - still not agreed to (no funds given, training up in the air)


[CategoryMeetingNotes]

WeeklyMeeting20240103 (last edited 2024-01-03 21:06:12 by JasonBergstrom)