Differences between revisions 3 and 4
Revision 3 as of 2024-01-02 20:26:02
Size: 1546
Comment: added a few more items
Revision 4 as of 2024-01-03 18:12:11
Size: 1842
Editor: c-67-161-108-221
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
  * NodeWhet -- upgraded from legacy DSL service to Quantum fiber (500Mbps symmetric) Very smooth process and install!
  * NodeGlow -- request from tenant for better wifi for online classes. Move existing MR.24 AP closer to apt. which requires PoE. Router is APU2 with no free ethernet ports.

Location: Jojo's 902 NW 13th
Date and Time: Wednesday, January 3, 2024, 6:30pm-8:00pm
Scribe: You
Roll Call: Them

Agenda

  • Pick location for next weekly
  • Node notes:
    • NodeAnnapurna -- A bunch of APs are plugged in, bridged with dumb switches. Ole is considering more APs to the additional stairwells, possibly another 5 MR24s. Some work done on Zyxel GS1900-24e switch firmware.

    • NodeBeulahLand -- is offline since early December, needs a visit

    • NodeWhet -- ISP transition report?

    • NodeLionsEye -- is offline since mid-December, needs a visit

    • NodeEcotrust -- needs a PoE injector for downstairs AP.

    • NodeAlhambra -- more adjustments, also moving towards a firmware refresh and vlan rationalization after initial experimental expansions

    • NodeBuffaloGap -- ap3 seems to be unreachable, will ping node host to see about a power cycle

    • NodeWhet -- upgraded from legacy DSL service to Quantum fiber (500Mbps symmetric) Very smooth process and install!

    • NodeGlow -- request from tenant for better wifi for online classes. Move existing MR.24 AP closer to apt. which requires PoE. Router is APU2 with no free ethernet ports.

  • Gear disposal:
    • 7 lengths of LMR400 gifted to a contributor, they had been in the stockpile unused for most of Russell's involvement with PTP, since the mid-aughts, unlikely to ever use them, given modern PoE-powered radios.
    • other random detritus, e.g. ancient 802.11b Cisco APs, in pile to go to e-waste.
  • APRA Grant update -- no news, presumably due to holidays. still waiting on security-instrument specifications, MOU finalization.
  • Russell going to Seattle on Thursday, back by Friday evening if not earlier.
  • Your Item Here

Notes

  • None Yet


[CategoryMeetingNotes]

WeeklyMeeting20240103 (last edited 2024-01-03 21:06:12 by JasonBergstrom)