Differences between revisions 8 and 9
Revision 8 as of 2024-11-13 07:21:33
Size: 1938
Comment:
Revision 9 as of 2024-11-13 15:24:58
Size: 1995
Editor: c-24-20-50-32
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
 * Possibly replace NodeBillyRays gateway with an E8450?  * Possibly replace NodeBillyRays gateway with an E8450?  *** This is a cash only establishment. Act accordingly.

Location: NodeBillyRays
Date and Time: Wednesday, November 13, 2024, 6:30pm-8:00pm
Scribe: You
Roll Call: Them

Agenda

  • Pick location for next weekly
  • Node notes:
    • NodeBeulahLand -- updated WDR3600-16m firmware

    • NodeLuckyLabSW -- updated WDR3600-16m firmware

    • NodeEdison -- updated WDR3600-16m firmware

    • NodeBracken -- updated WDR3600-16m firmware

    • NodeAnnapurna -- updated Watchguard Firebox M300 firmware

    • NodeMississippi -- updated ER-X firmware to compat-version 2.0

    • NodeSherrett -- updated ER-X firmware to compat-version 2.0

    • NodeLuckyLab -- updated ER-X firmware to compat-version 2.0 (also fixed up an erroneous but not terribly consequential device type from alix)

    • NodeBuffaloGap -- updated ER-X firmware to compat-version 2.0, sw3 needs a power cycle to reacquire DHCP lease on management network

    • NodeWhet -- updated DIR860L firmware

    • NodeGriswold -- update DIR860L firmware (took two tries, which was weird)

    • NodeKlickitat -- hardware refresh, replaced WDR3600's with E8450's and ArcherC7v2's, switch mesh interfaces from ibss to mesh-point. Seeing oddly low bit-rate on one of the ethernet links (100Mb instead of 1000Mb).

    • The remaining nodes awaiting firmware updates are the APU's
    • NodeLuckyLabNW -- Russell needs to ping node host about outdoor AP options.

    • NodeFirstUnitarian -- looking for a favorable weather window, combined with volunteer availability to install bell tower roof hardware.

    • NodeEdie -- coming soon in St Johns

  • Possibly replace NodeBillyRays gateway with an E8450? *** This is a cash only establishment. Act accordingly.

  • Ole mentioned trying to estimate parts and labor costs for cabling, looking to put a budget into the Umpqua grant application in March.
  • Your Item Here

*** Current Equipment: Netgear WGT634U (PTP's on indefinite loan)

Notes

  • None Yet


[CategoryMeetingNotes]

WeeklyMeeting20241113 (last edited 2024-11-13 19:32:20 by JasonBergstrom)