Location: NodeLuckyLab
Date and Time: Wednesday, July 26, 2017, 6:30-8:00 p.m.
Scribe: JasonBergstrom
Roll Call: RussellSenior,TedBrunner,KeeganQuinn,JasonBergstrom,SteveTree
Agenda
- Annual Members Meeting
Election of one member of the BoardOfDirectors
- Regular Monthly Meeting:
- Node updates are nearly done (only three APUs are left, plus any offline devices) includes:
- new ssh hostkeys,
- new OpenVPN keys and CA infrastructure,
- new root passwords and /etc/shadow hash.
- TP Link WDR3600 in some cases, e.g. with a private network and filtering rules, runs completely out of space on flash, solved by removing some unused psutils-ng applets from build configuration
- Worth noting that nodes that are offline will (probably) not be able be remotely reachable after the old CA key expires on August 3rd, if they come back up.
- Node customizations - script to capture some customizations and replay on upgrade.
- ie ptp-passwords.default script
- Interserver VPN links need updating for expiring CA key too, but luckily they aren't hiding behind firewalls.
- Node notes:
NodeCedarHillsCrossing -- DSL modem was replaced, but we had a different outage, appears to be a power delivery problem inside the mall, we couldn't reach either of the Buffalo WZR600DHP access points since noon-ish on Monday. Resolved Wednesday morning, when scissor lift was able to confirm the power to the ledge outlets was off, and the power was restored.
NodePotatoChampion still needs router to be returned and plugged in.
NodeEcotrust got its upstairs AP plugged back in, cable had fallen out of the PoE injector.
NodeLuckyLab -- will try to replace the APs with Meraki MR24's at the meeting.
NodeBeulahLand -- seems alix is okay, but roof is not reachable?
NodeLikewise -- needs a replacement MR24 and/or power supply
NodeMoby -- we are planning to add a Ubiquiti Nano Loco M2 and a long ethernet run to improve upstairs coverage.
- new VZA node coming in St Johns, meeting at the site next Monday.
- Offline nodes include:
NodeGarfieldFailing (Max Orhai's node, where is he??)
- Node updates are nearly done (only three APUs are left, plus any offline devices) includes:
Cleaning more (last of) the SkyPilots out of Russell's garage, schedule a work party?
<add your item here>
Notes
Board Vote (w/proxy from BenFoote): 4-2 JasonBergstrom-KeeganQuinn
- Node notes:
- PKI updates have been rolled out as well as node updates to all online nodes (except APUs) offline unavailable Aug 3
- Root CA offline, sub-CA on Russell's build host
- New root password and hash
- New per-host ssh host keys
- TP Link WDR3600 - 8MB flash, hot plug scripts and filtering rules were leaving 200K free
- Inter server links (knod/drei/iris) keys will expire
- Keegan suggested design was to have as sub-CA w/mult links to nodes
NodeLikewise - Russell replaced bad 48v power supply
NodeLuckyLab - Russell replaced APs with MR24s
NodePotatoChampion - Russell texted contact, was told another new contact would be in touch
NodePioneerSquare - SRG Architecture moving at the end of the year
NodeCedarHillsCrossing - Power out on ledge
Contacted AmandaFritz - out of the country
- New node in Arbor Lodge, Ted knows a film guy interested in joining the network
NodeEcotrust - network cable out of socket, re-plugged, have new contact
NodeBeulahland - rooftop not connected, needs visit
NodeMoby - moved node closer to stairs, still week connectivity to Alexa
- Needs Ubiquiti Loco on garage run outside, point at kitchen
NodeBillyRays - Node renamed to conform to 4-letter standard
- New VZA node - Carl Vanderzanden (part owner, manager of others) - N. Edison
- Two separate buildings, two stories high, but only 8 total units
- List of offline nodes, and Russell contacted Max Orhai about node as well
- PKI updates have been rolled out as well as node updates to all online nodes (except APUs) offline unavailable Aug 3
- Digital Inclusion meeting - should reconnect
- Russell contacted Steve Novick via Facebook, no response so far
Next week's meeting NodeBeulahland, following week's meeting at NodeKeegan (he will be getting some SkyPilots)
SkyPilot takeapart at RussellSenior's
- Possibly July 30th 10am or Sept 4 afternoon
- PTP tent has failed - bent bars + failed canvas - not meant to be permanently installed structure
- Community/map is now on drei: cwnmyr.personaltelco.net
- Russell will help provide data for customizations involved